The rainwater retention park, planned within the rehabilitation works in the A Malata area, will be integrated into the landscape as a green area.
The Ria de Farrol sewer system is to be completed in order to meet the requirements of the Directive 91/271/EEC on wastewater treatment. The objective is a bypass screening of discharge water at overflow thresholds to protect the water body during wet weather conditions to avoid overflow.